Dumping Project
The polygoon marsortial complex is about to be located in the Radol Company of Ecology-Novosibirsk, which concluded a concession agreement with the Government of the region. The company has already started work, organized a road-to-surface hearing. Local residents opposed the neighbourliness of the communal waste dump and the proximity of the polygon to the river. There are also claims for a concession agreement that will last 40 years.
Public hearings on the intersection of the Territory to build a road to land for solid municipal waste disposal took place in Rasdol on the eve. The Ecology-Novosibirsk Company, which had previously won the tender, is about to place the polygon and the garbage disposal complex. The concession contract with the organization will be concluded for 40 years, guaranteed income for two such sites (in Dashdol and Verh Tul) is 121 billion roubles, all of which have pledged to compensate the regional budget.
As the coordinator of the Scaleen Novosibirsk, Olés Valger, who was preparing for construction, was told by local residents who had learned the details of the agreement and the exact location of the future polygon shortly before the public road-building hearings. The owners of garden societies and local ecology are opposed to the location of the Spring Polygon and the plant.
“There are several groups that do not want this construction. First, it is the inhabitants of the outlying horticulture communities, because they are actually being offered to live next to the landfills and landfills. If the project was first in place Dumping factoryNow it's a landfill. It's a completely different thing, and she categorically doesn't like the locals, she told Walger to the correspondent. Sibcre.♪ The second problem is that the place is chosen next to the Izdrew River. And it's hardly the only river in an area where there's a good group of protectors - environmentals who have been cleaning up trash for 15 years. And it's in the vicinity of this factory.”
Related posts: